header-left
File #: 16-4213    Version: 1 Name:
Type: Agenda Item Status: Consent Calendar
File created: 2/3/2016 In control: City Council
On agenda: 2/11/2016 Final action: 2/11/2016
Title: LIABILITY CLAIMS/LAWSUITS The claim(s)/lawsuit(s) listed below was/were received by the City. Where applicable, the claim(s)/lawsuit(s) have been/are being researched and/or reviewed by Washington Cities Insurance Authority (WCIA). The claim(s)/lawsuit(s) status is/are as follows: NEW: Debra Hancock, DOI: 11/7/2015. Claimant alleges costs incurred to clear blockage in sewer line. $96.23 claimed. Ray Mathis, DOI: 01/22/2016. Claimant alleges costs incurred to replace inside of toilet after damage caused by city working on water lines. $162.00 claimed. Luis Salazar, DOI: 01/19/2016. Claimant alleges vehicle damage as a result of a metal plate at Downtown Streetscape site on Commerce being too high off of the road. $858.64 claimed. Nancy Yates, DOI: 09/08/2014. Claimant alleges sewer backup into home caused by city crew working on sewer line. Amount unspecified. DENIED: Eulalia Liedle, DOI: 12/21/2015. Claimant alleges that a city owned tree was not properly maintained and ...
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

LIABILITY CLAIMS/LAWSUITS

 

The claim(s)/lawsuit(s) listed below was/were received by the City.  Where applicable, the claim(s)/lawsuit(s) have been/are being researched and/or reviewed by Washington Cities Insurance Authority (WCIA).  The claim(s)/lawsuit(s) status is/are as follows: 

 

NEW:

Debra Hancock, DOI: 11/7/2015. Claimant alleges costs incurred to clear blockage in sewer line. $96.23 claimed.

 

Ray Mathis, DOI: 01/22/2016. Claimant alleges costs incurred to replace inside of toilet after damage caused by city working on water lines. $162.00 claimed.

 

Luis Salazar, DOI: 01/19/2016. Claimant alleges vehicle damage as a result of a metal plate at Downtown Streetscape site on Commerce being too high off of the road. $858.64 claimed.

 

Nancy Yates, DOI: 09/08/2014. Claimant alleges sewer backup into home caused by city crew working on sewer line. Amount unspecified.

 

DENIED:

Eulalia Liedle, DOI: 12/21/2015. Claimant alleges that a city owned tree was not properly maintained and fell on her fence during a windstorm. Amount unspecified.

 

Peggy Hofemann, DOI: 12/21/2015. Claimant alleges that a city owned tree was not properly maintained, resulting in the tree falling on her car during a windstorm. $15,000 claimed.

 

Susan Tibbles, DOI: 12/21/2015. Claimant alleges that a city owned tree was not properly maintained, resulting in the tree falling on her car during a windstorm. Amount unspecified.

 

SETTLED:

Rick Elkins, DOI: 10/01/2015. Claimant alleges costs incurred to repair broken sewer line. $741.42 paid.

 

American National, DOI: 10/22/2015. Subrogation claim for damages to vehicle received as a result of a collision with a police vehicle. $3,070.77 paid.