File #: 18-5429    Version: 1 Name: BID REVIEW - 24TH / 25TH ALLEY WATER & SEWER MAIN REPLACEMENT
Type: Agenda Item Status: Consent Calendar
File created: 5/3/2018 In control: Public Works
On agenda: 5/10/2018 Final action:
Title: BID REVIEW - 24TH / 25TH ALLEY WATER & SEWER MAIN REPLACEMENT COUNCIL STRATEGIC INITIATIVE ADDRESSED: Provide sustainable water quality & environmental infrastructure SUMMARY STATEMENT: This project will occur in the alley between 24th/25th Avenues, north of Maple Street. The water main portion of this project consists of installing approximately 1,010 feet of 8-inch and 4-inch water main, disconnecting and re-connecting 23 private water services, and installing 2 new fire hydrants and about 145 feet of 6-inch pipe connecting the hydrants. The sanitary sewer main portion of this project consists of installing approximately 680 feet of 8-inch sewer main, 23 service laterals, and 2 manholes. The project also includes replacing about 100 feet of 12-inch storm drain pipe, 3 catch basins, and restoring affected street and alley pavement. On May 2, 2018, three bids were received as follows: $765,701.49 - Nutter Corporation, Vancouver, WA $854,927.23 - Advanced Excavating Specialis...
Attachments: 1. 24TH_25TH Alley Vicinity Map.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Title

BID REVIEW - 24TH / 25TH ALLEY WATER & SEWER MAIN REPLACEMENT

 

COUNCIL STRATEGIC INITIATIVE ADDRESSED:

Provide sustainable water quality & environmental infrastructure

 

SUMMARY STATEMENT:

This project will occur in the alley between 24th/25th Avenues, north of Maple Street.  The water main portion of this project consists of installing approximately 1,010 feet of 8-inch and 4-inch water main, disconnecting and re-connecting 23 private water services, and installing 2 new fire hydrants and about 145 feet of 6-inch pipe connecting the hydrants.  The sanitary sewer main portion of this project consists of installing approximately 680 feet of 8-inch sewer main, 23 service laterals, and 2 manholes.  The project also includes replacing about 100 feet of 12-inch storm drain pipe, 3 catch basins, and restoring affected street and alley pavement.

 

On May 2, 2018, three bids were received as follows:

 

$765,701.49 - Nutter Corporation, Vancouver, WA 

$854,927.23 - Advanced Excavating Specialists LLC, Longview, WA

$958,760.52 - Catworks Construction, Battle Ground, WA

 

$735,000.00 - Engineer’s Estimate

 

All bids received were determined to be regular and responsive. 

 

FINANCIAL SUMMARY:

This project is funded by Water, Sewer, and Stormwater construction funds.

 

RECOMMENDED ACTION:

Motion to accept the low bid and award a contract to Nutter Corporation in the amount of $765,701.49.

 

STAFF CONTACT:

Sam Barham, Project Engineer